This EEC covers various routine maintenance activities that occur in the Savannah River Tritium Enterprise (SRTE) Limited Area.…
The Subcontractor shall provide periodic wellbore fiber optic mobile interrogation services at one or more SPR sites.…
Subcontractor will perform roof repairs on 773-41A. The Subcontractor will not disturb the existing roof on 773-41A.…
Replace light fixtures with LEDs at 717-10N/711-9N/711-N, 711-1N, and 711-2N. Replace 1 electrical wall heater in 711-9N and 5 electrical wall heat…
K-Area Trailers Repair…
Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…
This Amended Determination follows the approval of additional funds, period of performance, and new project performer (magniX USA Inc.) to support …
The Bonneville Power Administration (BPA) is proposeing to continue annual funding the Washington Department of Fish and Wildlife (WDFW) for Operat…
Seal coat and restripe the parking lot at 705-A.…
Repair sheetrock 766-H located in room 1061.…