The EEC covers the renovations to the interior of building 711-1N.…
The Defense Waste Processing Facility Shielded Canister Transporter Uninterrupted Power Supply has been in service since 2017 and it is degrading a…
Paint 253-1H switchgear exterior. …
Construction will paint the top of the Naval Reactor Core Barrel.…
Replace a door at building 701-3G (Barnwell Barricade).…
Construction will Demolition and Disposition Uninterruptible Power Supply (UPS), conduit and wiring connected to the following panels: breaker pane…
Upon demolition of control room panel as part of FCA, it was discovered that a section of the control panel was integrated into the main corridor h…
Replace Center Section Air Supply Fan 50 Pre-Heat steam coils (HCL 13 and 14) using specifications of existing coils, install drain from Supply Fan…
The EEC covers the renovations for the interior of building 713-1N.…
The Portable 221-S Mercury Cart Electrical Connection were found to be in a failed state and must be modified to be replaced.…