Bonneville Power Administration (BPA) proposes to remove the tops from approximately 16 trees that are currently either blocking, or at risk of blo…
CX-032509: Ault Substation Reactor Replacement and Hygiene and Windsor Substation Switch Replacement
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace equipment at Ault (AU), and Windsor (WND) substations in…
Paint, Repair Damaged Sheet Rock, and Replace Damaged Ceiling Tiles In 701-2L…
Replace Lift Station Pump No. 1 at 607-30F.…
730-2B Remodel Hallways, kitchen, bathrooms, and main lobby.…
Bonneville Power Administration (BPA) proposes to repair and improve access roads along the Driscoll-Naselle 115-kV No. 1 transmission line between…
Subcontractor will perform a roof repairs on 773-43A.…
Repair damaged stucco and seal/paint wall around outside of 773-A and 773-43A.…
This work will include replacement of two existing rooftop packaged HVAC units, located on the 773-A D-Wing roof. The Design Authority Engineer (DA…
Lab building improvements in 772-25B…