Domestic Water Line Valve HQ-234000-DW-V-80.018 (provides make-up water for 218-2H Cooling Tower) will be corrected/replaced.…
Fabricate and replace the existing guardrails on the dock at 713-2N. Guardrails will be fabricated in the shop. The existing concrete will require …
Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs and touch-up interior paint.…
The EEC covers painting of the stairways and exterior doors to 713-1N.…
A hose-in-hose transfer line will be routed from an existing manifold in the Tank 10 Center Riser to Tank 11 Riser 2.…
Replacing existing centrifugal switches for the 238-H Exhaust Fan A (53.001-A) with a new speed switch.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform routine maintenance activities and custodial services for buildings, …
Subcontractor will perform repairs to the roof on Bldgs. 773-43A and Bldg. 779-A.…
This activity involves disassembly and removal of 12 Lektrievers and 66 Space Saver racks in 704-1N.…
The EEC covers the renovations to the interior of building 717-3N.…