Perform grading activities on the west side of building 704-3N.…
Activities to troubleshoot, repair and/or replace light fixtures in radiological and non-radiological areas of L-area.…
Chilled water pump #1 is no longer working at 285-H. Pump #1 will be replaced with like for like pump to restore dependable operability.…
Upgrade men's and women's locker rooms in 704-K. Revision 2 is specific to the removal/replacement of existing flooring in Room 18. Both men's and …
Roof Repairs, 705-K…
Subcontractor shall provide inspection and cleaning as necessary of SRS cafeteria Exhaust Hood Systems located in 766-H and 704-S. This effort shal…
Bonneville Power Administration (BPA) proposes to remove approximately 337 trees that are currently either blocking, or at risk of blocking, the mi…
The CUIR is a site-wide utilities and infrastructure improvement project that will provide reliable, efficient, and sustainable utility systems to …
Drain Approximately 5 Lead acid batteries located at the Transformer Laydown Yard at 622-N.…
Perform office renovations in 704-L…