The EEC covers the renovations for the interior of building 713-1N.…
The Portable 221-S Mercury Cart Electrical Connection were found to be in a failed state and must be modified to be replaced.…
The purpose of this Temporary Modification is to install a temporary air supply via portable air compressors by way of a tie-in with the DWPF Plant…
To install permanent covers for the 735-22A Cylinder Storage Area for the hydrogen and propane gas delivery systems.…
Remote interlock is to be added to the Salt Solution Receipt Tank Process Vessel Vent Heater Controller.…
Additional K-Area Storage Building Beautification and Enhancements, Rooms 1029 and 1003.…
This EEC covers various general renovations for Building 773-A D-wing. Scope includes D
Remove weeds via pulling, cutting, clipping in the K-Area Sand Filter and Settler Tank Area. This is currently an inactive contamination area (CA).…
Repaint/Restripe K-Area Main Parking Lot outside of the Limited Area entrance.…
Conduct vegetation control activities and routine site monitoring and maintenance.…