Replace EQ Pump 001 at 607-16K.…
Tank Farm to Defense Waste Processing Facility Interarea Waste Transfer Line Cathodic Protection System is to be removed.…
Controls for the Pour and Drain Turntable are to be migrated to the Delta-V Distributed Control System.…
Subcontractor will provide roof replacement at 702-T.…
The proposed activities (PA's) are two design changes to building 233-H involving a new firewall penetration/fire stop system and a new interlock i…
C. E. Bourne Subcontractor 00000611 will provide roof repairs at 717-F.…
Perform interior and exterior renovations to Trailer 704-10F.…
717-F: Repair telephone cabinet north wall.…
PB-3 replace sample platform ladder.…
This EEC covers all replacement Process Chiller Refrigerant Monitors that can be performed at Defense Waste Processing Facility (DWPF).…