The wall of the elevator at 730-B will be painted.…
Revision 1 covers additional maintenance needs assoicated with flooring and underpinning.…
Subcontractor will provide gutter repair at 773-A, C-030.…
This EEC covers various general renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…
Wastewater disposal for Supertherm at the Salt Waste Processing Facility.…
Removal of asbestos insulation needed to repair steam leak at 218-H…
Add an additional portable BA header to run a second portable BA system simultaneously to support additional users at one time.…
613-7A Parking lot seal and restripe.…
Paint 905-108H MCC and replace structure sign.…
Floor tiles and metal cabinets will be replaced in lab 210 at the SREL main laboratory building, 737-A.…