Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
The EEC evaluates the chemical cleaning process to remove the scale deposits from the 242-16H (2H) evaporator pot using nitric acid and in-pot neut…
Install new roofing system on Building 167…
Replace the exterior siding and roof.…
Perform habitability improvements at 710-14N per the attached SOW.…
Apply coatings to the roof of the occupied/office area section of 713-1N, seal leaks and repair the gutter on the north sde of 713-1N.…
Replace MPC 13Ton Power Cable due to contamination.…
Subcontractor will provide roof repairs at 707-F.…