Temporary Modification (234H-TMC-22-333) to route HAOM Inert Compressor to process sewer drain leading to H-2 Outfall.…
Due to high OCN rates over several years of operation, replace the existing Room 41 GS Oxygen Monitor (MSA Toxgard model 485950) with a new device …
Replace roof on Building 901.…
Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
LM is proposing to conduct routine inspections, groundwater and surface water monitoring, and routine maintenance activities.…
Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
The Level Transmitter is being changed to a contactless radar.…