Replace roof on Building 901.…
Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
LM is proposing to conduct routine inspections, groundwater and surface water monitoring, and routine maintenance activities.…
Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
The Level Transmitter is being changed to a contactless radar.…
Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…