Augusta Industrial will suck/pump slurry sediment from the 285-H basin cells and transfer to a de-watering box. The dry sediment will be transferre…
Perform grading around building 710-17N to help with storm water runoff.…
This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
Proposed Activity includes routine electrical clean and inspect switchgear maintenance to Load Center B7 and various Temporary Modifications to pro…
Paint piping at 905-53A.…
Repair holes in the drywall inside the stairwell at 717-F.…
Safety items in H area (outdoors) will be repainted due to fading due to sun exposure.…
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of the electrical conductor insulators at the dead end towers, as wel…
Conference Room 32 in Building 234-H is going to be equipped with TV and Projector. The installation of two receptacles is going to be used to powe…
Review of Work Order tasks 1949521-01, Remove Asbestos Floor Tiles in 234-H, Rm 222 and 1950583-02, Remove/Replace Floor tiles and Paint Walls in 2…