The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 232-H Truckwell.…
Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
Renovate conferences rooms and adjacent corridors, entries, restrooms, and kitchenette in B-922 at NETL Pittsburgh, PA.…
Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, material stora…
Subcontractor will provide roof repairs at 704-52E / 704-53E. The Subcontractor “will” disturb the existing roof while performing these repairs on …