Bonneville Power Administration (BPA) proposes to repair existing underground storage tank drop tube, spill bucket, and two pipe caps. Small portio…
The system will be upgraded, fully replaced, or enhanced.
Design and Procure a new and more reliable TCON Process Chillers for Building 233-H. The existing two TCON process chillers shall be Dismantled and…
Design and Procurement of Replacement Glovebox Oxygen Monitoring Alarm Panel in the Central Control Room of Building 233-H.…
Evaluate/correct a brine solution leak at V-2261 in the chill water line for the office air handling unit at HB-Line soft structure.…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs will be cleaned and resealed. This is a routine …
Install Copper Cable and Fiber Optic Cable to 727-5N.…
Remove a section of the ductwork, metal duct tray and supports in 711-N IronWorkers Shop.…
Legacy research materials in 737-A, 772-25B, and 737-G will be inventoried, characterized, and disposed of accordingly. Transportaion of material t…