Remove a section of the ductwork, metal duct tray and supports in 711-N IronWorkers Shop.…
Legacy research materials in 737-A, 772-25B, and 737-G will be inventoried, characterized, and disposed of accordingly. Transportaion of material t…
703-46A Correct Storm Water Intrusion.…
Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road…
CM 4111: Light fixtures in 725-1N near can crusher are no longer working. Due to age and obsolescence, the 3 Metal Halide Low-Bay light fixtures in…
A domestic hot water line in 773-A, Room A-1132 is cur- rently leaking, PA is to replace the leaking section of pipe.…
Removal of the above ground cathodic protection system components on the TF to SS LAWTL as recommended in E-EPF-Z-00001 and E-DCFZ-475.…
Interior surface of Safety Class (SC) concrete wall under the steam condensation pipe at the eastern end of the 281-1H Delay Basin shows exposed ag…
Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 a…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g., cross arms, insulators,…