703-46A Correct Storm Water Intrusion.…
Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road…
CM 4111: Light fixtures in 725-1N near can crusher are no longer working. Due to age and obsolescence, the 3 Metal Halide Low-Bay light fixtures in…
A domestic hot water line in 773-A, Room A-1132 is cur- rently leaking, PA is to replace the leaking section of pipe.…
Removal of the above ground cathodic protection system components on the TF to SS LAWTL as recommended in E-EPF-Z-00001 and E-DCFZ-475.…
Interior surface of Safety Class (SC) concrete wall under the steam condensation pipe at the eastern end of the 281-1H Delay Basin shows exposed ag…
Bonneville Power Administration (BPA) proposes to replace insulators on two structures located at 17/4 of the 500 kV Grizzly – Captain Jack No. 1 a…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g., cross arms, insulators,…
The motor circuit for (Canyon ID) pump FA2 has a solid ground fault. There remain no original radiation grade (hardened) 15 Hp motors in the in the…
The purpose for this Scope of Work (SOW) is to replace the pea gravel sidewalk located at the premises of 704-7B and 704-12B and to extend the side…