The motor circuit for (Canyon ID) pump FA2 has a solid ground fault. There remain no original radiation grade (hardened) 15 Hp motors in the in the…
The purpose for this Scope of Work (SOW) is to replace the pea gravel sidewalk located at the premises of 704-7B and 704-12B and to extend the side…
Prep and paint 105-K Outer Assembly Area Walls.…
The 292-S Diesel Fuel Oil (DFO) Underground Storage Tanks (UST) No 1 will undergo draining, cleaning and inspection. During inspection, determinati…
Remove the various oils from equipment inside 284-H as part of facility layup.…
The Power Management organization at Idaho National Laboratory (INL) must perform timely maintenance and inspection activities on power poles and s…
The Decon Frit Slurry Recirculation Pump experiences premature diaphragm failures. Review of the manufacturer 's literature identified operational …
Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
BPA proposes to remove a failed culvert and associated fill material. The work would include excavating approximately 20,000 cubic yards of existin…