The 151-1C and 151-2C substation batteries and battery racks will be replaced due to age and the batteries being obsolete.…
Replace All Non-Emergency Light Fixtures at 730-2B.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required. These excavation activiti…
This EEC covers exterior painting in N area.…
Reinsulate pipe on water heater in 704-4N…
Touch up paint on 704-39G (storm shelter) and repair sheetrock/touch up paint in in 704-22G (conference room)…
Repair roof drain leak in elbow above conference room ceiling. Elbow and leak location (determined by Subcontractor) is covered by insulation with …
This EEC covers various general renovation activities for 748-A such as sprinkler head replacement, electrical modifications, and drilling.…
HVAC No. 2 for 211-8H Control Room is being replaced with a new (like for like) unit (WO No.2009200). Replacement will include replacing existing n…
This EEC will cover the repair of HB-Line exterior wall near the roof drainpipes to restore the damaged concrete to the original design capacity, t…