Construction will remove asbestos insulation around valves CAR-C-085 and -083 to allow for maintenance activities. Asbestos insulation will be disp…
Subcontractor will provide a roof replacement at 713-2N. The Subcontractor “will“ disturb the existing roof while performing this roof replacemento…
Various repairs to be made in 704-55E, Room 1.…
221-33F Install concrete bollards around exterior tank.…
Subcontractor will provide a roof replacement at 713-3N. The Subcontractor “will“ disturb the existing roof while performing this roof replacement …
704-C Install 2 outdoor covered picnic dining tables.…
Clean and apply Cool Seal coating to roofs of Trailers 704-31E, 33E, 37E, 47E, 49E, 50E, 51E, 66E Trailers 704-46E, 704-60E, and 704-73E added on R…
Repair water leakage into room 1029 in 766-H.…
645-2N Floor and wall painting.…
Overflow liquid from the recycle sump waste encasement is assumed to be leaking into a breeched section of the 6” as-built abandoned and capped und…