CX-032442: Building 201 Storm Sewer Pipe and Culvert Replacement

Replacement of storm sewer piping and culvert east and south of the parking lot would include selective demolition of existing area and grading alo…

Office of NEPA Policy and Compliance

May 24, 2024
minute read time

Replacement of storm sewer piping and culvert east and south of the parking lot would include selective demolition of existing area and grading along both sides of a new headwall to repair the streambank slope that has washed out, install rip rap at outlet, steel weir fabrication and installation, and grass restoration.