999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
The hydrogen system will be purged to replace valves.…
This EEC covers general renovations and modifications to C and B Wing in 773-A.…
Evaluate and Correct Process Well 905-108H.…
Deployment of a temporary frac tank system to replace the failing septic system, so that a plan to move forward can be formulated while the septic …
Subcontractor will perform a roof repairs on 735-A. The Subcontractor "will not" disturb the existing roof on 735-A.…
Remove current air compressor, Compressed air dryer and necessary piping. Install New Air compressor, two Compressed air dryers and necessary pipin…
The EEC covers the sealing of windows and roof of 711-6N.…
Maintenance Dredging of River Water Intake Canal 681-3G.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform routine maintenance activities and custodial services for buildings, …