999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
Upgrade men's and women's locker rooms in 704-K. Revision 1 is specific to the replacement of existing vinyl sheet flooring and extending work dura…
Replace Lift Station Pumps at 607-44H.…
Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…
Replace 248-H Wet Chemical Agent Cylinder due to Age…
This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
The failed roofing systems on the Assembly/910/911 roofs of 105-L will be demolished and replaced. This will prevent the numerous leaks that curren…
Pole K1225 needs to be replaced, and pole 37 needs repairs.…
The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…