Replace Lift Station Pumps at 607-44H.…
Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…
Replace 248-H Wet Chemical Agent Cylinder due to Age…
This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
The failed roofing systems on the Assembly/910/911 roofs of 105-L will be demolished and replaced. This will prevent the numerous leaks that curren…
Pole K1225 needs to be replaced, and pole 37 needs repairs.…
The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…
Fabricate and Install Replacement Trash Racks at 681-3G River Pump House.…
Renovation of the men's (Room E-62) and women's (E-61) restrooms in the Centerra-SRS Training Building 703-1B.…