Perform internal building repairs at 789-B.…
The purpose of this Modification Traveler is to provide design input to equipment with like equipment. This scope shall satisfy current operating p…
Building renovation of TA-03-271.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to repair two washout areas on an existing access road between stru…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to allow Tri-State Generation and Transmission Association, Inc. (T…
The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.
Replace posts and cables that span Lower Three Runs and Four Mile creek bed. These cables support the flow tracking device used to measure stream f…
The Recipient proposes to develop and field-demonstrate low-cost and multi-purpose technologies for monitoring substation physical security while p…
Subcontractor will provide roof repairs at 645-10N.…
This EEC covers reconfigure ceiling in 717-5N to expose sprinkler system.…