Install wall navigators in 730-B, 730-1B, 730-2B, and 730-4B.…
716-B Install receptacles for new tire machines. Tire machines are out of service and ordered new machines that have now arrived, but need a 24V co…
The proposed work activity is the replacement of the entire 772-4F.…
BPA proposes to repair about 3 miles of existing access roads and improve or replace 15 stream crossings along the Schultz-Raver and Rocky Reach-Ma…
Scope for instructions tab for all 3 tasks: Pressure switch for Fuel Pump 619-4N malfunctioned causing fuel oil to leak in the shop area at 717-3N.…
Activities include upgrading an existing CDR testbed facility, concurrent multi-pathway CDR testing, process modeling, data compilation and analysi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road, right-of-way (ROW), and structure f…
713-2N Repair damaged high-bay building insulation that is torn.…
Paint exterior of spare 18" river water globe valve.…
Painting without stripping/sanding/scraping in L Area Complex.…