Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA’s Bri…
Construction to repair HVAC duct at 731-5N due to storm damage.…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
735-4B Floor replacement in Shield Rooms.…
Routine maintenance/replacement of overhead roll-up door at 731-2N.…
Engineering to inspect 291-F annulus and duct work within the breech house.…
EEC covers all maintenance activities performed by SRNL organizations that have the potential to disturb gasket and/or gasket-like materials in cle…
The proposed work activity is to drain three totes containing wastewater from the F-Canyon Railroad Tunnel Sump (RRTS) to the Effluent Treatment Fa…
Control room and restroom renovations at 681-3G.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…