CX-033819: EES Water Gap Road Culvert Replacement

The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…

Office of NEPA Policy and Compliance

April 3, 2025
minute read time

The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Road