Continued operation of two (2) water jets in Building 221-33F. Additional sampling of abrasive/spent garment documented.…
Remove lead paint and pressure wash lift station structure pads at 607-66G, 607-68G, 607-65G, 607-85G, 607-84N, and 607-87G.…
Railroad Ties and Utility Poles Storage at 632-G Landfill.…
709-7G Septic Tank Replacement and addition of trailer.…
704-16G Room No. 2 Sample Lab Renovations…
Renovate rooms 1 and 2 at 705-N.…
Add additional power and install backer board in 707-27B.…
Install New Jockey Pump and Jockey Pump Controller at 902-3H.…
Install new receptacle in Room 125 in 731-1N.…
Remove abandoned pump base near 785-6A.…