TS / Repair Marvel Saw located in 711-1N.…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device Rev 1 Scope- Replace Pump Motors, Wiring, and Pipe Nipple at 715-3N. (…
Construction forces will perform maintenance on Milling machines and Lathe(s) as needed in 717-F. Coolant removal and replacement, oils removal and…
Install 12 UW drops in 711-9N Millwright Shop.…
Install 4 UW(Universal Wiring) Drops in 730-4B Rm. 1000…
The H-Area Tank Farm (HTF) facility needs a permanent design for supplying Chromate Water (CRW) to Tanks 35-37 above grade due to a recent undergro…
Bonneville Power Administration (BPA) proposes to remove and replace the current chain-link security fence and permanently remove the existing SPOK…