LM is proposing to perform road and culvert maintenance at the Shiprock, New Mexico, Disposal Site.…
LM is proposing to conduct routine inspection, monitoring, and maintenance activities, and aerial surveys at the Mexican Hat, Utah, Disposal Site l…
Fuel oil heaters 16, 23 and 24 in building 711-9N are not operable. Scope of work is to troubleshoot/repair the heaters.…
CM 4414 - Repair Domestic Water (DW) Lines at 717-1N and 717-8N.…
Subcontractor will provide a roof replacement at 731-4N. The Subcontractor "will" disturb the existing roof while performing this replacement on 73…
Remove/replace floor tiles in select portions of the Purification Area within the K-Reactor, and urinal in men's restroom.…
Subcontractor will provide roof repairs at 701-8G. The Subcontractor "will" disturb the existing roof while performing these repairs on 701-8G.…
The scope of this work is to mill, pave, install rumble strips and stripe approximately 4.7 miles of remaining section of Road C. The rehabilitatio…
Install Breathing Air Moisture Separator at 705-C.…