Bonneville Power Administration (BPA) proposes to remove and replace the current chain-link security fence and permanently remove the existing SPOK…
LM is proposing to transition the Panna Maria, Texas, Disposal Site, located approximately 50 miles southeast of San Antonio in Karnes County to LM…
Subcontractor will provide roof repairs at 704-7B and 704-12B. The Subcontractor will not disturb the existing roof while performing these repairs …
Subcontractor shall consist of furnishing all materials, equipment, supplies, transportation, tools, facilities, labor, and supervision required to…
Adding down-line electronic reclosers on distribution power line wood poles and replacing reclosers in existing substations.…
Deactivation of facilities 284-8F and 280-1F.…
Prep and Re-paint the FP Dry Pipe System for the 773-2A Cylinder Shed and Supply line from valve house.…
This EEC covers various renovation activities for Building 703-41A.…