Contractor will clean the ETP Outfall H-16 Diffuser from the Diffuser heads (4) located in UTRC to the weir box.…
This project includes adding grading and stormwater drainage improvements such as swales, berms, storm sewer piping, and catch basins at the Burma …
The U. S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to modify the 13.SkV ele…
Demolish existing fence surrounding the B25 equipment/material enclosure and replace with a slatted chain link fence. …
Apply roof coatings and seal roof leaks.…
Contractor will provide a roof replacement at 731-3N. The Subcontractor "will" disturb the existing roof while performing this replacement on 731-3…
105-K Men's Bathroom/Locker Room Renovations, Personnel Wing.…
Excavate, evaluate and repair a sinkhole in the area north of 218-1H and east of the 234-H main side Air Handling Unit. replace grassy area around …
Installation of Wi-Fi in 703-1B.…