Road 5 Milling, Paving, and Striping. Mill, pave and stripe Road 5 from Road 6 to Road C. Mill 3" of Road 5 and resurface with 1" Open Graded Inter…
Office of NEPA Policy and Compliance
March 20, 2025Road 5 Milling, Paving, and Striping. Mill, pave and stripe Road 5 from Road 6 to Road C. Mill 3" of Road 5 and resurface with 1" Open Graded Interlayer (OGI) and 2" of SRS Surface Course (Mix 1). Road will be striped (temporary and permanent) and raised pavement markers installed.