CM 4333- Re-insulate piping on water heater in 704-4N Mens bathroom.…
713-N Repair water damage.…
Painting the exterior of Building 701-1L.…
735-B Stairwell 601 repair fire barrier penetration.…
Installation of Wi-Fi in 782-3A.…
Install WiFi in 784-7A.…
A valve has been temporarily replaced with pipe blanks.…
The existing Seismic Detection Subsystem and a Tritium Confinement Subsystem (STCS) was designed in the late 1980's to confine tritium in seismical…
Remodel Foyer of 702-F.…
Subcontractor 00000611 will perform roof repairs on 246-H. The Subcontractor will not disturb the existing roof on 246-H.…