Purchase of Big Hill Control Valve Assembly CX(s) Applied: B1.3 Date: 04/16/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
772-F Chase 174 Sprinkler Modification CX(s) Applied: B1.3 Date: 04/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Sprinkler System CX(s) Applied: B1.3 Date: 04/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region
Casa Grande Substation, CAG 262 Breaker Replacement CX(s) Applied: B1.3 Date: 04/04/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Nogales Substation Temporary Laydown Yard CX(s) Applied: B1.3 Date: 03/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region