Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
685-G Par Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3 Date: 03/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Libby-Troy Access Road Upgrades CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
707-C Roof Replacement CX(s) Applied: B1.3 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Repair Sanitary Sewer Line South of 725-N CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Provide an Improved Heating, Ventilation and Air Conditioning System in 705-A CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Shipping Containers 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office