773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Routine Operating and Administrative Activities CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31 Date: 10/10/2013 Location(s): Missouri Offices(s): Kansas City Site Office
Gore Pass-Hayden 138 Kilovolt Transmission Line Emergency Repairs of Downed Conductor Grand County, Colorado CX(s) Applied: B1.3 Date: 10/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Hayden Communications Site Tower Removal and Parking Area Grading Routt County, Colorado CX(s) Applied: B1.3, B1.19 Date: 10/01/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18 CX(s) Applied: B1.3 Date: 10/01/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor Repair of Roof Leaks at 704-3N CX(s) Applied: B1.3 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Chemawa-Salem #1 & #2 Access Roads CX(s) Applied: B1.3 Date: 09/27/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Artesia Tap- Southwest Rangely 138 Kilovolt Transmission Line Danger Tree and Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region