Savannah River National Laboratory (SRNL) Building 735-13A Heating, Ventilation and Air-Conditioning (HVAC) System Addition CX(s) Applied: B1.3 Date: 11/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Protection and Communication Facilities Maintenance CX(s) Applied: B1.3, B1.7, B1.19 Date: 11/08/2013 Location(s): Arizona, Nevada, California, Utah Offices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor Repair of Roof Leaks at 704-L CX(s) Applied: B1.3 Date: 11/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 731-2N CX(s) Applied: B1.3 Date: 11/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 731-4N CX(s) Applied: B1.3 Date: 11/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 731-3N CX(s) Applied: B1.3 Date: 11/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 731-1N CX(s) Applied: B1.3 Date: 11/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove Failed Waste Transfer Drain Line 1533 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 703-47A. CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovate Radiochemistry Lab B138 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office