Install Multiplexing and Programmable Logic Controller (PLC) Equipment in 241-62FCX(s) Applied: B1.3Date: 07/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Bryan Mound Site Building Upgrades, Phase IICX(s) Applied: B1.3Date: 07/12/2011Location(s): Freeport, TexasOffice(s): Strategic Petroleum Reserve Field Office
Parking Garage Water Containment ProjectCX(s) Applied: B1.3, B1.15Date: 07/11/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
B-3 Area 160 Heating, Ventilation, and Air Conditioning UpgradesDate: 07/11/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
Big Eddy-Redmond and Redmond-Pilot Butte Wood Pole ReplacementsCX(s) Applied: B1.3Date: 07/07/2011Location(s): Wasco County, OregonOffice(s): Bonneville Power Administration
CCI-MP Transmission Line Access Road MaintenanceCX(s) Applied: B1.3Date: 07/06/2011Location(s): Montrose, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region
Gore Pass Substation Pole ReplacementCX(s) Applied: B1.3Date: 07/01/2011Location(s): Ground County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region
Non Resource Recovery and Conservation Act Permit Related, General Site Actions, and Non-Routine Actions at the Pinellas County, Florida Site LM 14 - 11CX(s) Applied: B1.3Date: 06/30/2011Location(s): Pinellas County, FloridaOffice(s): Legacy Management
West Hackenberry Raw Water Intake Structure Clear ZoneCX(s) Applied: B1.3Date: 06/29/2011Location(s): Lake Charles, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
B-14 Siding ReplacementCX(s) Applied: B1.3Date: 06/29/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory