Categorical Exclusion Determinations: B1.3

Rodgers-Cooolidge Structure MaintenanceCX(s) Applied: B1.3Date: 08/26/2011Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Hills Creek-Lookout Point #1 Wood Pole and Access Road MaintenanceCX(s) Applied: B1.3Date: 08/24/2011Location(s): Lane County, OregonOffice(s): Bonneville Power Administration
Invasive Species Removal and Reclamation in Gold Eagle Mining, IncorporatedCX(s) Applied: B1.3, B1.20Date: 08/24/2011Location(s): San Miguel County, ColoradoOffice(s): Legacy Management
Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission LineCX(s) Applied: B1.3, B1.13Date: 08/22/2011Location(s): Douglas County, WashingtonOffice(s): Bonneville Power Administration
Access Road Improvements Along Marion-Alvey #1 and Marion-Lane #1 Transmission LinesCX(s) Applied: B1.3Date: 08/22/2011Location(s): Marion, OregonOffice(s): Bonneville Power Administration
Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line CorridorsCX(s) Applied: B1.3Date: 08/22/2011Location(s): Wasco County, OregonOffice(s): Bonneville Power Administration