2013 Spokane District Wood pole Replacement Projects CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Washington, Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Place Old A-Cell Block Crane in Sealand Container for Disposal CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
North Gunnison-Salida 115-Kilovolt Pole Installation and Site Road Maintenance, Saquache County, Colorado CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy
Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Temporary Removal of the Tank 12 Purge Exhaust Reheater via HTF-TMC-13-028 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
300 square feet of Modified Bitumen Roof Repair CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Parker Dam to Gila 161-kilovolt Transmission Line, Cross Arm Replacement at Structure 0/7 CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration