Categorical Exclusion Determinations: B1.3

Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Temporary Removal of the Tank 12 Purge Exhaust Reheater via HTF-TMC-13-028 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Parker Dam to Gila 161-kilovolt Transmission Line, Cross Arm Replacement at Structure 0/7 CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region
2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
Herbicide Application at Four Substations: Blythe, Knob, Parker, and Senator Wash Located in California during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): California, California, California Offices(s): Western Area Power Adminis...