Ground and Janitorial Services CX(s) Applied: A1, B1.3 Date: 12/18/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation CX(s) Applied: B1.3 Date: 12/18/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Bryan Mound Substation Upgrade to 138 Kilovolts CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Hot Crossarm Changeout Training at 6 Structures CX(s) Applied: B1.3 Date: 12/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Xeriscaping at Four Facilities CX(s) Applied: B1.3 Date: 12/11/2013 Location(s): Oregon, Oregon, Washington, Montana Offices(s): Bonneville Power Administration
Roof Repairs at 735-A CX(s) Applied: B1.3 Date: 12/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 723-A CX(s) Applied: B1.3 Date: 12/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 742-A CX(s) Applied: B1.3 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-55H CX(s) Applied: B1.3 Date: 12/09/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office