Reclamation of Decommissioned Batteries, Test Satellites, and Facilities CX(s) Applied: B1.3, B6.1 Date: 08/06/2011 Location(s): Wyoming Offices(s): RMOTC
Reclamation of WellsitesCX(s) Applied: B1.3, B6.1Date: 08/06/2011Location(s): Casper, WyomingOffice(s): RMOTC
Maintenance / Grading of Existing Roads and Road Drainages (Barrow Ditches)CX(s) Applied: B1.3Date: 08/06/2011Location(s): Casper, WyomingOffice(s): RMOTC
Reclamation of Decommissioned Batteries, Test Satellites, and FacilitiesCX(s) Applied: B1.3, B6.1Date: 08/06/2011Location(s): Casper, WyomingOffice(s): RMOTC
Addition of Beneficial Bacteria to the Sanitary Sewer for Control of MetalsCX(s) Applied: B1.3Date: 08/03/2011Location(s): Albuquerque, New MexicoOffice(s): NNSA-Headquarters
Install a Portable Generator to Supply Electrical Power to the 241-74F Switchgear BusCX(s) Applied: B1.3Date: 08/03/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
B-Press and Extruder ModificationCX(s) Applied: A7, B1.3, B1.15, B1.16, B1.27, B1.31Date: 08/03/2011Location(s): Amarillo, TexasOffice(s): Pantex Site Office
Building 4 Mezzanine RenovationCX(s) Applied: B1.3, B2.3Date: 08/03/2011Location(s): Morgantown, West VirginiaOffice(s): Fossil Energy, National Energy Technology Laboratory
773-A, C-001 Roof ReplacementDate: 08/02/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Pole Inspections For C- Area - By Sub-Contractor (L)CX(s) Applied: B1.3Date: 07/26/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office