Categorical Exclusion Determinations: B1.3

Blast and Paint Bayou Choctaw Brine Pump Pad and Associate PipingCX(s) Applied: B1.3Date: 06/20/2011Location(s): Iberville Parish, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Blast and Paint West Hackberry Heat Exchanger Headers and Overhead Rack PipingCX(s) Applied: B1.3Date: 06/20/2011Location(s): Cameron Parish, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Connect 735-11A to the Central Plant Chilled Water SystemCX(s) Applied: B1.3Date: 06/15/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Replace Transfer Lines with Spare LinesCX(s) Applied: B1.3Date: 06/14/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Installation of Water Jet Cutter into 210-S Machine ShopCX(s) Applied: B1.3Date: 06/08/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Replace Heating, Ventilation and Air Conditioning Unit 736-A, Labs 131/132; Renovate Room 124CX(s) Applied: B1.3Date: 06/07/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office