Tank 7 Center Riser Install/Remove Temporary Isolation Valve V-8 CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Curecanti-Poncha 230 Kilovolt Transmission Line Cross Bar Ranch Project CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on Curecanti-Crystal, 115 Kilovolt Transmission Line Danger Tree and Vegetation Management CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA CX(s) Applied: B1.3 Date: 04/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks, Government Furnished Equipment CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/19/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southw...
Site Arc Flash Electrical Upgrades CX(s) Applied: B1.3, B2.5 Date: 04/16/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory