Categorical Exclusion Determinations: B1.3

Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Lusk Rural Substation Control Building Construction CX(s) Applied: B1.3 Date: 01/16/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 01/15/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 01/11/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region