Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility Water Main Extension for Fire ProtectionCX(s) Applied: B1.3, B1.15Date: 03/01/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland...
Herbicide Applications Along Gravel and Paved Roads on the Hanford SiteCX(s) Applied: B1.3Date: 03/01/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office
Underground Domestic Water Leak at Chips RoadCX(s) Applied: B1.3Date: 02/28/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Casper Service Center Floor DrainDate: 02/28/2011Location(s): WyomingOffice(s): Western Area Power Administration-Rocky Mountain Region
Drain Line Replacement West of 735-ACX(s) Applied: B1.3Date: 02/24/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Tucson-Apache Erosion Repair & Cactus RelocationCX(s) Applied: B1.3Date: 02/23/2011Location(s): Pima County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Repair Bayou Choctaw Timber Pipe SupportsCX(s) Applied: B1.3Date: 02/22/2011Location(s): Bayou Choctaw, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
West Hackberry Off-Site Services Contract, 2011-2013CX(s) Applied: B1.3Date: 02/22/2011Location(s): West Hackberry, TexasOffice(s): Strategic Petroleum Reserve Field Office
Clean and Inspect West Hackberry (WHT-14) Brine TankCX(s) Applied: B1.3Date: 02/22/2011Location(s): West Hackberry, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Replacement of Big Hill Deep Anode Ground Bed Site for Cavern 103CX(s) Applied: B1.3Date: 02/22/2011Location(s): TexasOffice(s): Strategic Petroleum Reserve Field Office