Categorical Exclusion Determinations: B1.3

Coolidge Substation (Septic Tank Cleaning)CX(s) Applied: B1.3Date: 12/14/2010Location(s): Coolidge, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region
Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) SamplingCX(s) Applied: B1.3Date: 12/07/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
On-Dock Rail Straddle Portal Test Facility Roller Compacted Concrete Paving PlanCX(s) Applied: B1.3Date: 12/07/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Replace Air Handling Unit Heating, Ventilation, and Air Conditioning (HVAC)-AHU-20984 (HVAC-FAN-E21) with HVAC-AHU-E-1, Building 773-A, Section E Southeast RoofCX(s) Applied: B1.3Date: 12/07/2010Location(s): Aiken, South CarolinaOffice(s): Savannah Riv...
Installation of Bryan Mound and West Hackberry Wellhead Survey MonumentsCX(s) Applied: B1.3Date: 11/23/2010Location(s): TexasOffice(s): Strategic Petroleum Reserve Field Office
On-Dock Rail Straddle Portal Test Facility Roller Compacted Concrete Paving PlanCX(s) Applied: B1.3Date: 11/12/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Boysen-Copper Mountain Structure 98/1 Replacement Project, Fremont County, WyomingCX(s) Applied: B1.3, B4.6Date: 11/10/2010Location(s): Fremont County, WyomingOffice(s): Western Area Power Administration-Rocky Mountain Region