2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
Repair Roof at 192-2K CX(s) Applied: B1.3 Date: 07/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
704-K Water Heater Replacement CX(s) Applied: B1.3 Date: 07/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Bayou Choctaw 500 KVA Power Transformer CX(s) Applied: B1.3 Date: 07/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Mead KU2A Emergency Bushing Replacement CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of Secure Transportation Construction of Permitted Area Boundary Fence and Vehicle Entrapment Gates CX(s) Applied: B1.11, B1.3, B1.15, B2.2 Date: 07/02/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Herbicide Application at Four Substations: Blythe, Knob, Parker, and Senator Wash Located in California during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): California, California, California Offices(s): Western Area Power Adminis...
Herbicide Application at 40 Substations Located in Arizona During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Herbicide Application at Four Substations: Amargosa, Boulder City, Henderson, and Mead located in Nevada during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Re...