Zones 11 and 12 Steam Line Replacement CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Texas, Texas Offices(s): Pantex Site Office
Repair West Hackberry Brine Tanks, WHT-14 & WHT-15 CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to Bryan Mound Brine Tank CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/24/2012 Location(s): California, California Offices(s): Western Area Power Administration
Replace Three Wood Poles-In-Kind at Bryan Mound West Gate CX(s) Applied: B1.3 Date: 08/23/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Security Upgrades Project CX(s) Applied: B1.3, B1.11Date: 08/22/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Security Upgrade Project (4598) CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
B-33 Facility & Heating, Ventilation, and Air Conditioning Renovations CX(s) Applied: B1.3, B1.15 Date: 08/17/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Site-Wide Sidewalk Improvements and Seal and Repair Pavement CX(s) Applied: B1.3 Date: 08/17/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory