Routine Maintenance 300 Area CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Montrose Operations Center Asphalt Overlay Project CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Big Hill Recycle Line Repair CX(s) Applied: B1.3 Date: 07/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration