CX-012626: Categorical Exclusion Determination

Replace Antifreeze in Sprinkler System F-wing Loading Dock CX(s) Applied: B1.3Date: 41793 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

June 3, 2014
Estimated Read Time   min
Replace Antifreeze in Sprinkler System F-wing Loading Dock
CX(s) Applied: B1.3
Date: 41793
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Replace glycol antifreeze with glycerine in the fire sprinkler system in F-wing loading dock.

Document(s) Available for Download