CX-012338: Categorical Exclusion Determination

Amargosa Substation (Conduit and Storage Pad Installation) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Nevada Offices(s): Western Area Power Administration-Desert Southwest Region

Office of NEPA Policy and Compliance

June 3, 2014
Estimated Read Time   min
Amargosa Substation (Conduit and Storage Pad Installation)
CX(s) Applied: B1.3
Date: 06/03/2014
Location(s): Nevada
Offices(s): Western Area Power Administration-Desert Southwest Region

Western Area Power Administration (WAPA) proposes two activities in the existing Amargosa Substation located in Henderson, Clark County, Nevada. The purpose of the project is to remove hazard to personnel from exposed cable; and to prevent material damage by installing a concrete pad for storage.