Modifications Required on Tanks 13 and 15 CX(s) Applied: B1.3Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916) CX(s) Applied: B1.3 Date: 06/24/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Danger Tree Management on Green Mountain-Blue Ridge Repeater 2.4-kilovolt Distribution Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/23/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Replacement Air Dryer for the HB-Line Breathing Air System CX(s) Applied: B1.3Date: 41810 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Tacoma Communication Site Engine Generator Replacement CX(s) Applied: B1.3 Date: 06/19/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Process Water Instrument Air System Reconfiguration at 284-H CX(s) Applied: B1.3Date: 41808 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Two Sets of Railroad Tracks on Road D in A-Area CX(s) Applied: B1.3Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hayden-Vernal 138-kilovolt Transmission Line Road Maintenance and Structure Replacements, Uintah County, Utah CX(s) Applied: B1.3 Date: 06/17/2014 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Southwestern Power Administration proposes to construct two berms inside the station and spread new gravel.…
Install Condensate Release Valves on 108-1K Compressed Air System CX(s) Applied: B1.3 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office