Modifications Required on Tanks 13 and 15 CX(s) Applied: B1.3Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 30, 2014Modifications Required on Tanks 13 and 15
CX(s) Applied: B1.3
Date: 41820
Location(s): South Carolina
Offices(s): Savannah River Operations Office
E-DCP-H-11001: The Proposed Activity (PA) removes contactors that provided power to Tank 13 Submersible Mixing Pumps (SMPs). The contactors are replaced with manual transfer switches that are capable of supplying power to Tank 13 or Tank 15 SMPs. M-DCP-H-11030: Installation of Tank 15 Purge exhaust modifications.
CX(s) Applied: B1.3
Date: 41820
Location(s): South Carolina
Offices(s): Savannah River Operations Office
E-DCP-H-11001: The Proposed Activity (PA) removes contactors that provided power to Tank 13 Submersible Mixing Pumps (SMPs). The contactors are replaced with manual transfer switches that are capable of supplying power to Tank 13 or Tank 15 SMPs. M-DCP-H-11030: Installation of Tank 15 Purge exhaust modifications.