Building 6 Stack Replacement CX(s) Applied: B1.3Date: 41855 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 4, 2014Building 6 Stack Replacement
CX(s) Applied: B1.3
Date: 41855
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Replace two existing R&D project exhaust stacks with duplicate stacks. One stack is 18" dia. x 40' tall. One stack is 24" x 40' tall. Both stacks have a 4' dia. x 12' tall silencer to top.
CX(s) Applied: B1.3
Date: 41855
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Replace two existing R&D project exhaust stacks with duplicate stacks. One stack is 18" dia. x 40' tall. One stack is 24" x 40' tall. Both stacks have a 4' dia. x 12' tall silencer to top.