Inhibited Water Header Drain Addition on Tank 11 and Tank 15 CX(s) Applied: B1.3Date: 12/11/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 11, 2014Inhibited Water Header Drain Addition on Tank 11 and Tank 15
CX(s) Applied: B1.3
Date: 12/11/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The Inhibited Water (IW) header will be used periodically to support Bulk Waste Removal (BWR) operations. The electrical heat tracing for this header has been previously disconnected. A cost effective solution to provide freeze protection to this header is to add a low point drain to enable the header to be drained.