Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities CX(s) Applied: B1.3 Date: 08/02/2012 Location(s): New York Offices(s): West Valley Demonstration Project
Wautoma-Ostrander Surface Impairment Removal CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
North Bonneville-Midway No. 1 Tower 75/4 Replacement CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Routine Maintenance 300 Area CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Montrose Operations Center Asphalt Overlay Project CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Big Hill Recycle Line Repair CX(s) Applied: B1.3 Date: 07/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office