Categorical Exclusion Determinations: B1.3

Dismantle and Removal(D&R) of Abandoned and Out of Service A-773000-Chilled Water(CHW)-Chiller Unit(CHU)-1 CX(s) Applied: B1.3 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Airport to Boyd 115 Kilovolt Transmission Line Structure Replacements Larimer County, Colorado CX(s) Applied: B1.3, B4.6 Date: 06/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Condensate Return Piping Replacement Project (T-40 to B-22) CX(s) Applied: B1.3, B1.15 Date: 06/12/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory